Owner contrary to approved site plan didn’t construct porch and verandah and covered hundred percent area without maintaining setbacks neither from front side nor from backside and whatever little left by owner has been compensate by extending galleries on ground floor and first floor both in equal size
Owner paid building fee for permissible construction area but covered hundred percent plot area which caused serious loss to JMC exchequer and major dent to JMP-2032 and Unified Building Bye-laws 2021
GY CORRESPONDENT
jammu, may 26
J&K Housing Board was established in March, 1976 by virtue of Jammu & Kashmir Housing Board Act, 1976 with a view to provide ‘Affordable Shelter for All’ and to make such Schemes and to carry out works as are necessary for the purpose of satisfying the Housing needs and providing residential and office accommodation in the State. The Board endeavors to enhance the living standards of the State and therefore emphasizes on special housing schemes for every section of the society. At the apex level, there are Board of Directors appointed by the Government under Section 3 of the Board Act.The Chairman appointed by the Government heads the Board. The Board so set up, decides all the policy matters and other necessary paraphernalia for carrying out various activities. Notwithstanding all this now days these housing Board plots are being used for business point of view and as a result of which these residential plots keep on transferring from original alottee to others without following laid down terms and conditions to own a Housing Board plot. All this has resulted in land use change from residential to commercial as those who have already well furnished residential houses in posh colonies Trikuta Nagar and Gandhi Nagar have switched on towards Channi Himmat colony for commercial purpose and have bought plot for business point of view.To put things in perspective, one Ankit Gupta s/o Amit Gupta r/o Sector-6 Trikuta Nagar Jammu purchased a residential plot 466/3 Channi Himmat Jammu measuring 1660.81 Sqft (16.87×9.14 mtr) in Ward-50 from Niyaz Ahmad Lawy s/o late Abdul Jabbar Lawy on 24.6.2022. The owner accordingly got approved residential site plan approved from JMC vide No. 2219/JMC/BS/2022 dated 23-3-2023. According to approved site plan, the owner was allowed ground and first floors 98.81 Sqm, 2nd floor 41.50 Sqm and open area of plot kept 55.39 Sqm. The owner was duty bound to observe setbacks including front-4.06 mtr, rear 2 mtr and accordingly pay building charges for permissible construction area. As per approved drawing of building, the owner was allowed to construct two bed rooms in the back and Lobby, verandah, porch and Kitchen towards front side. But the owner contrary to approved site plan didn’t construct porch and verandah and covered hundred percent area without maintaining setbacks neither from front side nor from backside and whatever little left by owner has been compensate by extending galleries on ground floor and first floor both in equal size. This construction badly obstructed ventilation and sunlight of immediate neighbours. At present the construction of 2nd floor is going on . Yet again it is very unfortunate to note that so far enforcement staff has not taken any cognizance of this violated construction and it seems that they wait for our newspaper to first publish a story in this regard then they will proceed which has been observed in the three years, The question arises why enforcement staff consistently failing in taking action at initial stage of violation. It deserves mentioning here that the owner has already applied for conversion of leasehold rights to freehold rights in his favour and simultaneously undertaking violated construction by covering hundred percent area without maintaining setbacks and at present the plaster and construction of 2nd floor is going on which prima-facie proves that the owner being a builder by profession constructing this house for sale and purely from business point of view. In the light of above , Commissioner JMC and Secretary and Incharge BOCA Authority should take serious cognizance of this and should immediately stopped this violated construction failing which it will result in boom in unauthorized constructions against JMP-2032 and Unified Building Bye-laws 2021.
Trending
- Commercial construction reaches third floor on residential plot 250-C, Sector-2 Channi Himmat Zonal planned colony without maintaining setbacks completely contrary to residential approved site plan with no provision of windows, ventilators, cut out and JMC now serves owner notice under provision of section 253(1) JMC Act 2000 without mentioning actual violations like three floors commercial, extended galleries, iron stairs from backside and no internal walls partitions
- JMC stuns Channi Himmat by sealing Varmani Shopping Complex, Channi Himmat, Sector-2, Ward-50 on 30-12-2024 for violations to tune of 8053 sqft in basement+ground+3 floor excluding violated 4th floor of 2674 sqft correcting earlier violations of 1704 sqft and de-sealing Complex on 31-12-2024 for 20 days besides allowing its functioning since 2013 without depositing compounding fee Rs 127800 by owner as decided by J&K Special Tribunal dated 30-12-2013
- JMC enforcement staff after shaking hands with owner allows restart of three unauthorized big size commercial shops at residential plot 29-C, Shastri Nagar, Ward-22 which remained stopped for sometime after aggrieved locals opposed commercial construction and print media highlighted violated construction along with pictures dated 21-10-2024 making land use change without getting site plan approved from JMC which can’t be done plot being bifurcated
- JMC yet again makes mockery of notice under section 253 (1) JMC Act 2000 served to owner of residential plot 66/5 ,Ward-50 Channi Himmat wherein serves 48 hours ultimatum to owner to remove violations dated 14-10-2024 but without taking follow-up action against owner approves fresh site plan dated 28-11-2024 when existing violations were not removed by owner after giving written undertaking and further construction of two floors started
- JMC Building Section out of way sanctions stilt floor commercial parking stage-1st at commercial sites 3,4 and 5 in Sector-2 Ward-50 Channi Himmat and enforcement staff fails to take action against owners when differently approved site plans clubbed and raised joint construction of commercial halls as single unit without maintaining setbacks and not constructing new stilt floors commercial and in spite of violations in stage-1st construction JMC approved stage 2nd construction and at present stage-2nd construction going on from last 15 days with help of enforcement staff
- Commercial construction reaches third floor on residential plot 250-C, Sector-2 Channi Himmat Zonal planned colony without maintaining setbacks completely contrary to residential approved site plan with no provision of windows, ventilators, cut out but JMC yet to take action against owner despite highlighting violated construction in Print Media along with pictures and bringing same in notice of concerned enforcement staff deployed in Channi Himmat Zonal planned colony
- JMC Enforcement staff deputed in Channi Himmat Ward-50 allowing construction of commercial hall on residential plot 634/3 without maintaining setbacks, without partition of walls, windows, ventilators with stairs on front side and also with lift provision absolutely contrary to residential approved site plan doing huge injustice with those who have purchased commercial sites
- Existing violated structure on private land falling under Khasra No. 4 Min, Ward-51, Channi Himmat earlier sealed, site plan withdrawn, then restored without removing violations now undergoing complete renovation and conversion from sanctioned mixed use of both residential and commercial to full-fledged commercial halls on three floors measuring 10000 sqft each to run big size shopping mall without JMC permission but with help of enforcement staff deployed in Channi Himmat