Owner in her sale deed dated 26-3-2018 has mentioned that bifurcated portions which she purchased had got collapsed due to heavy rain and subsequently demolished by owner Ramesh Kumari from whom she purchased and now there is an open plot along with a compound wall existing on spot. But surprisingly when JMC served BOCA notice to owner, she claimed that she is undertaking repairing work of her existing residential structure which only means that she is big liar as if the existing structure collapsed in 2018 what she was repairing which has been aptly proved by her that she has undertaken altogether fresh construction
Without NOC from J&K Housing Board and JMC permission, owner undertook fresh construction by completely dismantling existing residential construction with help of JMC enforcement staff against guidelines of JMP-2032 and Building Bye-laws 2021
When locals protested violative construction, the owner moved an application to JMC dated 12-10-2022 claiming that she is undertaking repair work without any roof replacement but owner was undertaking altogether fresh construction with new walls, windows and roofs, steel beaming and steel framing on ground and first floor and it was not at all any repairing work as was claimed by owner to hoodwink JMC
Owner wrongly moved an application to JMC dated 12-10-2022 claiming that she is undertaking repair work as the house she resides in is old one and has developed cracks and that permission be provided to her to repair the same without any roof replacement so that the structure can withstand seismic vulnerability whereas in reality undertook altogether fresh construction
Owner also lied before Tribunal that her immediate neighbors have already given NOC to her for renovation/altercation work when there was no such works but fresh construction and infect her neighbours were the one who strongly protested against this construction and even registered complaints before Commissioner JMC
Trending
- JMC enforcement staff after shaking hands with owner allows restart of three unauthorized big size commercial shops at residential plot 29-C, Shastri Nagar, Ward-22 on 19-2-2025 which remained stopped for sometime after aggrieved locals opposed commercial construction and print media highlighted violated construction along with pictures making land use change without getting site plan approved from JMC which can’t be done plot being bifurcated
- Residents of Channi Himmat strongly resent Commissioner JMC seeking NOC from J&K Housing Board to establish Rehri Zone at existing Parking site of Channi Himmat main Shamshan Ghat constructed at estimated cost of Rs 78 lacs over Thangar Nallah drain urging both JMC and Housing Board to drop idea in larger interests of Channi Himmat residents and those attend cremations
- JMC finally serves sealing order under JMC Act 2000 to owner of private land falling under Khasra No. 477 Min in Sector-3, Ward-51,old village Channi Himmat when four floors violated structure making 66.37% violations on each floor already completed and husband of owner Dr Rajeev started running Day Care Medical Centre by covering 750 Sqft against owned 644 Sqft without maintaining setbacks and public parking within premises against JMP-2032 and Unified Building Bye-laws 2021
- Forest fire rages on at shrine board from last one month, no accountability
- JMC’s sealing & de-sealing orders to owner of residential plot 274/3,Ward-50, Channi Himmat proved counter-productive for owner as full-fledged commercial hall after removing partition walls of existing ground floor still intact despite undertaking submitted by owner to construct brick walls partition but constructing plywood partitions to hoodwink JMC authorities
- JMC serves owner eyewash de-sealing order without mentioning actual violations to owner of residential plot 328/4 , Ward-50 Channi Himmat for raising violated full-fledged commercial ground floor plus three floors against permitted ground plus two floors without maintaining setbacks, height against JMP-2032 and Unified Building Bye-laws 2021 when construction going on from last ten months and now reaches finishing level
- JMC approves commercial site plan allowing owner to cover 100% plot area in construction of commercial basement for storage & utility and commercial ground floor without mentioning their height not mandating to maintain setbacks at JDA’s commercial site No.5 Phase-II commercial complex Fruit Market, Narwal Fruit Mandi Jammu, Ward-49 adjoining with Head Branch of J&K Grameen Bank against JMP-2032/Unified Building Bye-laws 2021
- JMC unmoved towards unauthorized running of children play centre in both first and 2nd floors and a restaurant cum canteen in the third floor of residential plot 649/3 on main road of Channi Himmat Housing Board Colony even when J&K Housing Board endorsed three letters to Commissioner JMC to act against owner for running commercial activities from residential plot by making sheer breach of lease deed and also against JMP-2032 and Unified Building Bye-laws 2021