Author: Golden Yug

After publishing of story dated 13-11-2024, the owner continued violated construction making land use change in the wrap of opaque sheet and installed back window towards front side of kitchen but rest of the violated construction is still intact. It is highly unfortunate that open land use change is going on but as on date JMC enforcement staff deployed in Ward -50 has not moved even an inch despite bringing the same into kind notice of Enforcement staff much to the agony of aggrieved locals who have already strongly resented land use change openly and brazenly and as on date…

Read More

Mukesh instead of reporting to Matron Super Specialty hospital Jammu to perform given duties as per Superintendent order , he without any official order started performing his duties in the department of Cardiology, SSH Jammu from 19-1-2015 to 31-10-2019 It is very strange to note that without any official order, how Dr Sushil Kumar Sharma HoD Cardiology allowed him to perform his duties and then relieving him on 31-10-2019 without any order of competent authority of joining duty in the department of Cardiology and also getting relived from the department of Cardiology that too without any official order It is…

Read More

The owner deviating from approved site plan raised commercial hall without maintaining setbacks and didn’t construct proper kitchen, living room, drawing room and porch. However it deserves mentioning here that the owner initially to hoodwink general public kept window for kitchen on ground floor and main entry from porch area and raised stairs quite back of porch to reach first and 2nd floors and didn’t construct duplex house and keeping entry to kitchen from porch area . The owner actually constructed commercial hall measuring nearly 1400 sqft area against allowed 1056 sqft each floor besides constructing extra room on 2nd…

Read More

The owner just before Diwali 2024 once again started commercial activity using residential porch and also main gate as shutter to run garments business both men and women under name and style RK Fabrics from whole of residential ground floor but sadly JMC is as on date is reluctant to take action against owner which proves that owner is enjoying full patronage of JMC enforcement staff to run RK Fabrics from whole of residential ground floor measuring 1000 Sqft. GY CORRESPONDENT jammu, nov 8 “When the cat is away, the mice must play” and “Run with the hare and hunt…

Read More

JMC maintains in BOCA notice under section 7(1) that owner against total plot area 936 sqft raised construction on an area of 907.5 Sqft , the owner constructed ground and first floors 907.5 Sqft each against permitted 711 Sqft making violations of 27.63% on each floor. The owner made hundred percent violations of both front and rear side by not leaving front side 9 ft and rear side 3 ft and 5 inch but failed to demolish violations as mentioned above` JMC after 14 months of Bank branch functioning served owner demolition BOCA notice under provision of section 7 (3)…

Read More

Serious nature violations at e site wherein owner constructed altogether commercial construction on ground and first floor were not highlighted in BOCA notices under Section 7(3) and 7(1) served to owner and in a way made every possible efforts to save commercial construction of owner raised after getting residential site plans approved from JMC and covering hundred percent plot area and raising both ground and first floor both measuring 1040 Sqft each against permitted 510 sqft without maintaining setbacks and any provision of public parking within premises Owner deviating from residential approved site plan raised illegal and unauthorized construction in…

Read More

The owner got approved residential site plan for double stories from JMC vide No. 481/JMC/BS/2018 dated 26-11-2018 against application No. 6153 dated 6-1-2017 and as per approved site plan, the owner was allowed 45% construction and also duty bound to maintain mandatory setbacks including front side 6 mtr, rear 3 mtr, sides -1st, 3 mtr and side-2nd , 2 mtr as per JMP-2032 but owner before starting construction bifurcated residential plot into two parts and raised two story residential house adjoining with residential house 30-C without maintaining setbacks and kept open 2nd part of bifurcated plot towards main road of…

Read More

JMC failed to take section against owners under Section 242 of Unified Building Bye-laws 2021 which says that no person shall erect or commence to erect any building or execute any of the works specified in Section 244 except with the previous sanction of the Commissioner. Further any person who intends to erect a building shall apply for sanction by giving notice in writing intention to the Commissioner in such form and containing such information as may be prescribed by Bye-laws but the same was not observed in violation cases as mentioned above and deliberately spared action against owners after…

Read More

Due to no follow-up action by JMC , owner approached Hon’ble High Court Jammu under WP© No. 1865/2023,CM No. 4313/2023 dated 21-7-2023 against sealing of shop only to get de-sealing order when JMC was duty bound to take action against violations of ground floor and construction of two more violated floors first and 2nd floor covering 100% plot area without maintaining setbacks and also raising construction absolutely contrary to approved site plan which were projected in BOCA notice 7(3) dated 8-7-2022 which they conveniently put on hold after joining hands with owner GY CORRESPONDENT jammu, oct 16 The owner Durga…

Read More

It is highly surprising that when JMC and its enforcement staff badly failed to implement status quo order at the site , Enforcement Officer Anil Kashyap in an eyewash action served owner BOCA notice under provision of Section 7(1) vide No. JMC/Enf/19/01/2021-24 dated 29-7-2024 under BOCA Act 1988 instead of Commissioner JMC action under Section 256 of JMC Act 2000 and projected favourable violations in favour of owner and didn’t project actual violations served ultimatum to owner to reply to this notice within 48 hours as to why Khilafwarzi should not demolished violated structure but didn’t take any follow-up action…

Read More