Owner running coaching centre under name and style Credible Institute of Learning, foundation NEET, JE 9th class to 12th class from residential house 600/3 measuring 30×55 Sqft , Ward-50 without parking facility having three stories . As per Housing Board record residential plot 600/3 stands registered in name of Vinod Kumar s/o Chaman Lal r/o 139 opposite Dak Banglow Jammu JMC served public notice to nearly 227 alotees of Housing Board plot for making land use change from residential to commercial and the same was widely published in print media under DIP/J-4188-P dated 9-1-2020 and residential plot 600/3 was also…

Read More

Owner with a consideration of sudden rise in price of commercial sites in Channi Himmat dropped his mind to raise residential construction as nearby surroundings of this residential plot, there were already well established business units including Varmani Shopping Mall. The owner to execute his commercial plan applied for fresh residential site plan from JMC to modify existing ground floor built in the year 2009-2010 and to enhance and cover already left area from backside besides willingness to demolish existing Porch as per Unified Building Bye-laws 2021 Owner after getting revised site plan residential started and raised altogether commercial construction…

Read More

Owner as per registry of land in Court of law owned only 1000 Sqft but owner raised construction covering nearly 1359.8 Sqft and the extra land he occupied was part of irrigation land road which was not taken care of by Enforcement staff while visiting site and also locals bringing in their notice that owner has covered road area what to think of observing mandatory setbacks which speaks volumes the sincerity of enforcement staff with which it works in the field. As per demolition order dated 18-5-2024, owner was directed to demolish /pull down violated construction within seven days from…

Read More

JMC remained unmoved even when excessive digging was strongly resented by locals as the owner covered hundred percent area and even covered nearby flowing waste water Nallah by putting slab on Nallah to facilitate two way entry both from front side and back side being a corner plot having approaching road both towards front and back side After publishing story , the construction work remained stopped for few days, but owner taking into confidence enforcement staff on 8-6-2024 started removing rough concrete which was earlier filled under strong public pressure sensing that now things are settled and that now nobody…

Read More

These three differently approved site plans basically belongs to one family as in two approved site plans one name is common that is Sahil Gupta and third plot also a part of same family and deliberately clubbed three plans to acquire more area after taking into confidence the favour of enforcement staff who have already shut their eyes over this violated construction of three shops Raj Kumar Gupta a habitual offender and master of raising violated construction with active connivance of enforcement staff was served BOCA notice under provision of section 7(3) vide No.MJ/CEO/206/3/2011 dated 24-9-2011 for raising commercial construction…

Read More

Owner purposefully didn’t get site plan approved from JMC as had the owner got approved site plan from JMC, he would have been permitted only 70% construction on plot area and 30% was mandatory to be left for parking purpose but the owner at the site raising construction of shop by covering 100% plot area and the work is going on continuously Enforcement Inspector Gagan Kumar has the habit of disregarding complaints by social and RTI Activists who are serving whistle blowers so that JMP-2032 can be implemented in letter and spirit. It is high time to hold Gagan Kumar…

Read More

It is shocking to note that after status Quo dated 4-5-2021 obtained from J&K Special Tribunal by owner, JMC maintained status Quo of shutting their eyes and ears but the owner during status quo period successfully raised three more violated floors on ground floor wherein status quo was enforce covering nearly 12000 sqft each besides walls raised on 4th floor and a room with active support of enforcement staff deputed in the area. When illegal construction was going on smoothly, whistle blowers along with aggrieved people strongly objected to continue construction when Status Quo was in placed, JMC as a…

Read More

The owner purposefully didn’t get site plan approved from JMC as had the owner applied for approval of site plan , he would have got only 70% construction and was duty bound to leave 30% for parking and moreover he couldn’t have got permission to construct basement which was constructed by owner by covering hundred percent area under construction and raising further three floors When slab work being done on 2nd floor, the photographs of same along with relevant details were sent on whatsapp numbers of enforcement staff on 2-5-2024 seeking immediate action and to stop slab work on first…

Read More

The ongoing construction of tin shed was duly brought into kind notice of Enforcement Inspector deputed in area Gagan Kumar by aggrieved locals but instead of taking action against owner, he lied that the work is stopped but the shed work is going on as on date. This is now a well established modus operandi that initially raise tin shed get the walls white washed simultaneously and later using modern techniques available in market turn it into impressive first floor and the same will be done in the present case also Despite well defined powers designated to enforcement staff, they…

Read More

Surprisingly JMC approved site plan measuring area 6 Kanal 7 Marlas (3071.10) sqmtr whereas the owners sought land use permission from JDA for area 5 Kanals and 13 Marlas. This is shocking to note that why more land was shown while approving site plan and why land use permission was sought for 5 Kanals and 13 Marlas which prima-facie suggests allowing more area against permitted construction According to stage-2nd approved site plan ,the owners were allowed new basement-1 commercial as 1808.79 Sqm (19470) Sqft whereas in stage-1st approved site plan new basement-1 commercial was 1780.48 Sqm (19164) Sqft was for…