Author: Golden Yug

Building Section team found violation of 106 Sqft which was in addition to ownership right of owner as area under construction was 750 Sqft, 300 Sqft violations in stilt, first,2nd and third floors(66.6%) against allowed 450 Sqft each. With regard to maintaining setbacks, the owner made 100 % violations towards front side against 10.25 ft and height violated by 2.44%, FAR violated by 43.12% Owner didn’t construct stilt floor on the basis of which the owner was allowed an extra floor and instead the owner converted the stilt floor into Laboratory, lift and stairs by putting big iron gate toward…

Read More

Secretary JMC & Incharge BOCA Authority Channi Himmat while replying to RTI Application filed in this regard vide No. JMC/CEO/68-69 dated 28-4-2023 claimed attaching violations reports but these violations reports were nor relevant and didn’t pertain to site ¾ Channi Himmat and thus openly proving her patronage to owner JMC didn’t take any action against owner after serving statutory notice to owner and after taking undertaking that owner will not raise commercial construction and will raise construction only as per approved site plan and as a result of which the owner constructed three violated floors without observing mandatory setbacks GY…

Read More

Mohinder Singh owner of Housing Board residential plot 542/3 Channi Himmat Jammu already facing trials from Housing Board/JMC for sheer breach of lease deed and land use change from residential to commercial Enforcement Inspector Jasbir Singh who was duty bound to submit violations report was infect helping and supporting owner to raise big three shops covering hundred percent area without maintaining setbacks GY CORRESPONDENT jammu, may 9 Jammu Municipal Corporation has totally failed to curve illegal and unauthorized constructions of buildings and other structures which not only violate the Municipal laws and the concept of planned development of the particular…

Read More

All these four residential site plans were wrongly approved by showing approach road width as 4.87 mtr (16 ft) whereas under JMP-2032 and Unified Building Bye-laws the approach shouldn’t be less than 20 ft and also when there is only thorough passage for villagers measuring nearly 10ft Chief Enforcement officer, Zone-V in his reply to RTI application filed in this regard said that owners of all four plots have raised construction of first and 2nd stage as per approved site plans conveniently ignoring serious violations including land use change from residential to commercial Then Enforcement Inspector Varun Kesar deputed in…

Read More

After piling of serious nature complaints including allowing unauthorized construction against Enforcement Inspector Varun Kesar , he was transferred but not held accountable Varun Kesar allows construction of steel fabricator structure on private land comprising Khasra No. 65 Min measuring 9 Marlas falling in village Channi Kamala, ward-51,Sector-3 after firstly constructing fencing and then ramp constructed along with completing plaster work without getting site plan approved from JMC Varun Kesar didn’t submit violations report despite bringing same into his notice resulting in running of unauthorized washing service station under name and Style, Bankay Car Wash Station by fraudulently managing water…

Read More

This so called residential construction has no front entry door and has only windows on ground, first and 2nd floor and completely changed internal dimensions and not only this raised three floors all in equal size by not constructing verandah neither on front or backside Housing Board team led by Assistant Executive Engineer Channi Himmat area dated 7-12-2022 visited site along with JMC team found completely changed dimensions at site and ultimately stopped shuttering work of 2nd floor, but work restarted on 15-12-2022 as JMC didn’t take any action against owners Owners produced two undertakings one before JMC and another…

Read More

Chief Accounts Officer transferred before her tenure for refraining from any engagement of manpower/ backdoor appointments and in order to realize ulterior agendas of nexus and purely because she attempted to prevent a huge loss to government exchequer Honest CAO punished as she tried to save Govt/Public money, tried to bring right facts in front of all and requested to follow Govt rules and regulations citing lack of budget for new engagements but transferred in gross violation of GAD order wherein specified tenure of an officer is no less than 3 years LG Sinha and CS Mehta known for their…

Read More

Meantime the owner has started changing dimensions including closing stilt floor by installing three big iron gates with compound wall covering stilt floors along with installation of Tube-well without PHE permission and separate stairs for convenience of flats owners which means that JMC deliberately shielding violative construction of owners JMC instead of taking appeal of J&K Special Tribunal order wherein owners clubbing two separately approved residential site plans and constructing commercial flats without maintaining setbacks seeking compounding of violations against approved site plans at old village Channi Himmat, Ward-51 Sector-3 There was quite a leniency on part of enforcement staff…

Read More

Minga Sherpa given Addl charge of Director of Information, J&K GY CORRESPONDENT jammu, Apr 27 In a major reshuffle, 10 Indian Administrative Service officers were among 21 top officials transferred in the Jammu and Kashmir administration on Thursday, officials said.As per two separate orders, transfers and new postings were ordered by the Lieutenant Governor Manoj Sinha. Baseer-ul-Haq Chaudhary, IAS (AGMUT:2015), Deputy Commissioner of Pulwama, has been transferred and posted as the Managing Director of the Kashmir Power Distribution Corporation Limited. Sachin Kumar Vaishy, IAS (AGMUT:2015), Deputy Commissioner of Shopian, has been transferred and posted as the Deputy Commissioner of Udhampur,…

Read More

This commercial approved site plan has no mention of size of plot , dimensions of plots including length, breadth and curvature without which how come that area was shown 25500 Sqft besides there was no mention of width of access road to this site from front and backside that is whether its front is towards Dogra Chowk or towards Vinayak Bazzar to set setbacks in accordance with guidelines of JMP-2032 and also newly framed Unified Building Bye-laws-2021. Moreover length and breadth of basements were also not mentioned in site plan. According to sources, existing area at the site is not…

Read More