Author: Golden Yug

The owner raised commercial Hall with basement without maintaining setbacks except front side and didn’t leave 6.5 mtr from backside and side-1 6.5 mtr and didn’t construct bedroom, drawing room, living room, dining room and kitchen and constructed two shop and keeping its front towards internal road of colony covering nearly 2500 Sqft against total plot area 3200 Sqft when he was entitled only 55% (1760 sqft) construction area and also extending 2 ft gallery towards public road side Despite commercial hall construction on residential plot , the owner somehow managed to get free hold rights of residential plot from…

Read More

When RTI filed dated 4-7-2024, the construction of 4th floor was going on but JMC didn’t take any action as concerned Enforcement Inspector Gagan Kumar didn’t submit violation report despite highlighting same in print media and as a result of which at present as on date the 4th floor is fully functional and coaching classes are being run from 4th floor from residential house 600/3 GY CORRESPONDENT jammu, sep 16 One Amit Sharma purchased a residential plot 600/3 measuring 30×55 sqft Channi Himmat Housing Board Colony from original alotee Vinod Kumar s/o Chaman Lal r/o 139 opposite Dak Banglow Jammu.…

Read More

The owner after halting construction for over one year couple of days ago restarted construction of attached room on existing Porch measuring 200 Sqft besides steel structure from backside and under the guidance of enforcement staff deputed in area simultaneously white washing ongoing construction of room as is visible from picture clicked on 13-9-2024 by aggrieved locals when such a construction on porch is strictly prohibited as per approved site plan when allowed terrace only GY CORRESPONDENT jammu, sep 13 One Ramesh Chander s/o Nagar Mal c/o M/S Ramesh Enterprises Jammu owner of residential plot 152/7 measuring 40X80 (3200 Sqft)…

Read More

The owner raised commercial Hall with basement without maintaining setbacks except front side and didn’t leave 6.5 mtr from backside and side-1 6.5 mtr and didn’t construct bedroom, drawing room, living room, dining room and kitchen and constructed two shop and keeping its front towards internal road of colony covering nearly 2500 Sqft against total plot area 3200 Sqft when he was entitled only 55% (1760 sqft) construction area and also extending 2 ft gallery towards public road side Despite commercial hall construction on residential plot , the owner somehow managed to get free hold rights of residential plot from…

Read More

JMC must remember that running a commercial entity in a residential area does cause nuisance, environmental pollution due to ingress and egress of customers vehicles and disturbs the peace of the residents of the neighborhood thus affecting the quality of air, causes noise pollution and thus affects the right to life of the residents in the area as guaranteed by Article 21 of Indian Constitution Conversion of residential house into commercial one is new trend prevailing in Channi Himmat Housing Board Zonal planned colony as the rate of commercial properties is touching sky in recent times and every influential owner…

Read More

JMC remained unmoved even when excessive digging was strongly resented by locals as the owner covered hundred percent area and even covered nearby flowing waste water Nallah by putting slab on Nallah to facilitate two way entry both from front side and back side being a corner plot having approaching road both towards front and back side After publishing story , the construction work remained stopped for few days, but owner taking into confidence enforcement staff on 8-6-2024 started removing rough concrete which was earlier filled under strong public pressure sensing that now things are settled and that now nobody…

Read More

The owner didn’t raise residential construction on ground floor like bedroom, lobby, kitchen, toilet , cut out for ventilation , staircase towards front side but to hoodwink general public and JMC Authorities kept 2 ft size two windows and small size door 2 ft in size in middle of these two windows to show construction being residential to hide construction of full-fledged commercial hall on ground floor . Owner didn’t leave front 9 ft when he was duty bound to leave 12.5 ft besides extending 2 ft gallery on ground floor and also didn’t leave 7 ft 9 inch from…

Read More

As per approved residential site plan, the owner didn’t construct Porch towards left side measuring 3.7 mtr wide, kitchen measuring 1.9 mtr x 3.0 mtr in middle and towards right side dining room measuring 2.7 mtr x 3.0 mtr towards front side ,Lobby measuring 3.3 mtr x 5.1 mtr, Bed room 3.7 mtr x 3.0 mtr with toilet 1.5 mtr x 2.5 mtr and infact constructed full-fledged commercial hall without any brick walls partitions besides lift provision from backside The owner left meager 5 ft from front side and extended three ft gallery as well when he was duty bound…

Read More

JMC in BOCA notice 7 (3) projected violated area of 360 Sqft against sanctioned 1960+ 180 Porch area making it 16.8%, first and 2nd floors constructed 2915 Sqft each against permitted 1960 Sqft covering excess area 955 Sqft making violations as 48.7%. In the notice it was wrongly mentioned that owner was to leave front 19 ft 9 inch and owner left 25 ft 3 inch however as per approved site plan the owner was mandatory to leave nearly 31.5 ft from front side. However in reality the violation of front side was 6 ft 2 inch, likewise the owner…

Read More

Owner as per approved site plan didn’t construct kitchen , bedroom with attached toilet , lobby and raised three commercial halls with provision of ramp and elevator absolutely contrary to approved residential plot but sadly JMC from initial stage to present stage of completion of three commercial floors didn’t take any action and extended every possible help to owner to raise violated construction. As per report of Surveyor dated 26-9-2023 reported that plot is vacant at the time of inspection. As per report of Dy General Manager dated 9-10-2023, Housing Unit No.1 , the plot is enclosed with boundary wall…

Read More