Trending
- JMC fails to serve notices under JMC Act 2000 to owner of residential plot 629/3, Channi Himmat for raising three floors commercial structure without maintaining setbacks , changing both internal and external dimensions after getting residential site plan approved from JMC but not raising residential construction except keeping space for temporary windows and keeping two way entry completely deviating from approved site plan contrary to JMP-2032,UBBL-2021, JMC Act 2000
- Both JMC & J&K Housing Board act as mute spectator towards running of HIGH5 ARCADE+SOFTPLAY+CAFE at residential plot 649/3, Sector-3, Ward-50 Channi Himmat Colony after owner earlier raised commercial halls without internal partitions completely deviating from approved residential site plans both stage-1st and stage-2nd against JMP-2032,UBBL-2021 & JMC Act 2000 with JMC serving owner delayed notice without any follow-up and Housing Board completing formalities of dispatching letters to JMC seeking action against owner resulting in continuance of commercial activities from residential plot from last 8 months
- JMC’s BOCA notices and undertakings by owners fail to stop unauthorized constructions in absence of their implementation on ground as witnessed on residential plot 203/2 on main road side Channi Himmat Ward-50 where JMC after serving BOCA notice to owner didn’t take any action after owner submitted undertaking resulting in running of RK Fabrics earlier from shop of residential ground floor now from whole of ground floor residential making land use change and raising first floor without JMC permission without maintaining setbacks
- JMC fails to stop restarted unauthorized modern steel structure on existing violated three floor commercial structure from last one month at residential plot No. Extn 8/9 Sector-C Ward-69, Sainik Colony when validity of approved commercial site plans validity stands expired on 16-2-2023 and earlier dramatizing fake demolition drive on Feb 28, 2022 falsely claiming demolishing violated portion of floors, after serving eyewash notice to owner under section 7(1) of J&K BOCA Act 1988 dated 8-1-2022 but taking no follow-up action
- JMC first allows unauthorized construction on existing violated ground floor at residential plot 66/5, Ward-50, Channi Himmat then wrongly approves conditional site plan taking undertaking from owner that existing violations shall be removed before start of fresh construction but allows first and 2nd floor commercial halls with unauthorized 3rd floor when owner didn’t remove violations on existing ground floor and instead extended galleries up to 3rd floor without observing setbacks as per UBBL-2021 now serves demolition order dated 8-3-2025 drastically reducing violations hiding actual violations at site
- JMC fails to implement J&K Special Tribunal Status Quo order in vogue since 10-1-2022 at commercial plot in Greater Kailash main road, Lane-10 near HDFC Bank, Ward-68 allows owner not only to complete violated ground, first and 2nd floor all measuring 1185.5 Sqmt each against permitted 559 Sqft each but also unauthorized 3rd floor measuring 208 Sqm without maintaining setbacks completely deviating from approved site plan besides allowing owner to start commercial activities on ground floor under name and style Barista and Blue Moon Unisex Spa and Saloon on 2nd floor from last 8 months when status quo is still intact and next date of hearing is on 24-4-2025 before Tribunal Bench-III
- JMC unmoved towards unauthorized running of children play centre in both first and 2nd floors and a restaurant cum canteen in the third floor of residential plot 649/3 on main road of Channi Himmat Housing Board Colony even when J&K Housing Board endorsed three letters to Commissioner JMC to act against owner for running commercial activities from residential plot by making sheer breach of lease deed and also against JMP-2032 and Unified Building Bye-laws 2021
- Both JMC & JDA passing buck on each other in owning responsibility of ongoing commercial constructions at Fruit Mandi Complex Narwal, Jammu in case of ongoing commercial construction at commercial site-5, Ward-49 wherein JMC has provided 100% coverage to owner without asking her to maintain setbacks and JMC issues permission in these types of schemes as per coverage confirmation given by JDA with respect to lease agreement and JK UBBL-2021 does not implement in these plots whereas JDA itself admits in a RTI reply that JDA has been approving site plans as per UBBL-2021 since its approval from Board of Directors of JDA in the meeting held on 1-12-2021